top of page

Solar Power Plant ve  Turnkey Project

Güneş Enerjisi Santrali ve Anahtar Teslim Proje

As an EPC Company; guaranteed turnkey project by undertaking all engineering, procurement, assembly and testing phases of the project we do;

Solar Power Plant Project, Installation - Commissioning and Investment Monitoring System;

Solar Power Plant System Design and GES Engineering Services,

Follow-up of Official Permits and Consultancy Service,

Electrical, Mechanical and Static Project (Approved by TEDAŞ) Solar Power Plant Project,

Product Supply and Logistics Process Management,

Construction Service of Solar Power Plant Electrical Works and Solar Power Plant Mechanical Workmanship,

Güneş Enerjisi Santrali (GES) Müşavirlik

Güneş Enerjisi Santrali (GES) yatırımınızın Arazi geliştirmesinden, planlanmasından devreye alınmasına kadar olan süreçte; uygun ürünlerin belirlenmesi, şartnamelerin hazırlanması, tedarikçiler ile görüşmelerin sağlanması, tedarik süreçlerinin takibi, devreye alma aşaması, kısaca anahtar teslimine kadar olan bütün süreçte müşavirlik hizmeti sunuyoruz.

GES (Güneş Enerjisi Santrali) Arazi Geliştirme

Arazi Geliştirme ve/veya Çatı Planlaması, Evrak Süreçleri

GES (Güneş Enerjisi Santrali) Kredi ve Finansman Desteği

Kredilendirme, Standartlara Uygunluk ve Sürdürülebilirlik

GES (Güneş Enerjisi Santrali) Arazi Geliştirme, Kredi / Finansman Desteği

İnşaat Süreci, Devreye Alma ve Garanti

Güneş Enerjisi Santrali REFERANSLAR

Solar Power Plant REFERENCES

Licensed & Unlicensed Solar and Wind Energy Construction Works;

  • Kinesis Energy- Özmen 1 SPP 17 Megawatts (MW) / Muğla

  • Karaörenler RES 10 Megawatt (MW) / Hatay

  • Ala RES 10 Megawatt (MW) / Manisa

  • Hallaç GES 400 Kilowatt (kW) / Mersin

  • Keçiören Municipality SPP 5 Megawatts (MW) / Ankara

  • Dörtyol Municipality SPP 500 Kilowatts (kW) / Hatay

  • Şanverdi SPP 250 Kilowatts (kW) / Hatay

  • Mesut DEMIRASLAN GES-1 9 Kilowatts (kW) (Turkey's first temporary acceptance facility) 2012- / Beypazarı

  • Mahmut SAYILIR - SPP - 4 Kilowatts (kW) - 2012 / Kahramanmaraş

  • Sütçü İmam University GES 10 Kilowatt (kW) - 2012 / Kahramanmaraş

  • Mesut DEMIRASLAN GES-2 75 Kilowatts (kW) 2013 / Beypazarı

  • UMSE SPP 600 Kilowatt (kW)- 2016 / Beypazarı

  • IŞIK 1-2-3 SPP 3 x 1.000 Kilowatt (kW) 2017 / Beypazarı

  • Andromeda GES 11 x 1,000 Kilowatts (kW) 2019 / Ağrı

  • ATAŞ SPP 3X1000 Kilowatt (kW) 2019 / Erzincan

  • Şereflikochisar SPP 7 x 1.000 Kilowatts (kW) 2017 / Ankara

  • ÜNTES SPP 3 x 1.000 Kilowatts (kW)

  • Büyükorhan Municipality SPP 1 x 1.000 Kilowatt (kW) / Bursa

  • EGE Grup Yapı SPP 6 x 1.000 Kilowatts (kW)

  • Hayat OTO GES 1 x 1.000 Kilowatts (kW)

  • Paper Clip GES 2 x 1.000 Kilowatts (kW)

  • Mert FURKAN GES 1 x 500kilowatts (kW)

Licensed SPP (Solar Power Plant) Projects;

  • SOLENTEGRE SPP 8 MWe (Turkey's first Approved Licensed GES Project) / Elazig – Akfen Holding

  • YAYSUN SPP 9.98 MWe / Konya – Akfen Holding

  • MT SPP 9.98 MWe / Konya– Akfen Holding

  • ME-SE SPP 9.98 MWe / Konya– Akfen Holding

  • OMICRON ENGİL208 SPP 9.95 MWe / Van – Akfen Holding

  • PSİ ENGİL207 SPP 9.95 MWe / Van  - Akfen Holding

  • VAN ERCİŞ SPP 9.95 MWe / Van – Akfen Holding

  • HAMAL GES 9 MWe / Sivas – YBT Energy

  • DENİZLİ TAVAS GES 5 MWe / Denizli – Dalsan Group

  • RENOE ACIPAYAM SPP 15 MWe / Denizli – Erikoğlu Holding

  • APA GES 10 MWe / Konya – Limak Holding

  • TAŞKESİĞİ GES 10 MWe / Antalya – Bayburt Group

  • SİLOPİ GES 7 MWe / Şırnak – Astor Group

  • ÖZMEN 1 SPP 14 MWe / Muğla – Kinesis Energy

Unlicensed SPP (Solar Power Plant) Projects;

  • Kula GES 19 x 1.000 kWe (Cüneyt ZAPSU Consulting) 

  • Akhisar GES 18 x 1.000 kWe (Cüneyt ZAPSU Consulting) 

  • Amasya SPP 12 x 840kWe (Akfen Holding) 

  • Ağrı GES 11 x 1.000 kWe (Andromedas A.Ş.) 

  • Emirgazi GES 6 x 500 kWe 

  • Eskişehir GES 14 x 1.000 kWe (Sunplast A.Ş.) 

  • Özyörükler GES 7x1000 kWe (Özyörük Maden A.Ş.) 

  • Karaşar 1-2-3 SPP 3 x 1.000 kWe (Selman SARAÇ) 

  • Işık-1-2-3 - 3 x 1.000, kWe (Selman SARAÇ) 

  • UMSE GES 1 x 600 kWe (Selman SARAÇ) 

  • EMTA Kablo GES 3 x 1.000 kWe (EMTA Kablo A.Ş.) 

  • Bird Seat GES 5 x 990 kWe (Akfen Holding) 

  • Kıvanç GES 2 x 1.000 kWe (Kıvanç Testil) 

  • Mimarsinan OSB GES 8 x 300 kWe (Mimar Sinan OSB) 

  • Sarıoğlan GES 6 x 1.000 kWe (Cüneyt ZAPSU Consulting) 

  • YST-ZHT-Kavaklı GES 3x1000 kWe 

  • SAMSUNPORT SPP 2 x 1.000 kWe (Samsun Port Management Inc.) 

  • Unlicensed SOLENTEGRE GES 1 x 500 kWe (Akfen Holding) 

  • Karine 1 x 500 kWe (AKFEN HOLDİNG) 

  • Yeldeğirmeni GES 1 x 800 kWe (EN-SU Engineering - Consultancy) 

  • Kocatepe GES 1 x 990 kWe 

  • Sinan DEMİRDÜZEN GES 1 x 990 kWe 

  • Kardelen GES 1 x 900 kWe 

  • Oligo GES 1 x 900 kWe 

  • Solar Dynamic GES-2 1 x 500 kWe 

  • Mersin Noyan GES 1 x 900 kWe 

  • Erzincan Special Provincial Administration GES 1 x 1.000 kWe 

  • Mahmut Argun ŞAHİN GES 1 x 200 kWe 

  • Gökhan KARAMAN GES 1 x 250 kWe 

  • Hüsamettin ATAK GES 1 x 150 kWe 

  • Pelit GES 1 x 200 kWe 

  • Mesut DEMIRASLAN GES 1 x 84 kWe 

  • SPE GES 1 x 1.000 kWe 

  • Akalp GES 1 x 200 kWe 

  • Özgür GÜNDÜZ GES 1 x 500 kWe 

  • Kameri Testil GES 1 x 500 kWe 

CONTACT US